products
  PROJECT INTRODUCTION >>>
PROJECT ACHIEVE SCHEDULE
  
  

 
 Name of Project  Time
I. Items loaned from international financial organization  
World Bank Project (ICB)  
Dalian Wastewater Treatment Plant Laboratory Instruments  2001
Jincheng Paper Mill Red Liquor Extraction  1997-2001
Shenyang Solid Waste Treatment Center Equipment (10 packages)  2000
Fushun Wastewater Works Analyse Instruments  2000
Liaoning and Shandong Education Committee Equipments  1998-1999
Fushun Wastewater Factory Pump Station Equipments  1999
Jinzhou Water Company pipes  1999
Shenyang Environment Protection Solid Waste Center Checkpoint  1997
Benxi Iron and Steel Company No.2 Coke Oven Battery Charging and Pushing Emissions Control System  1997
Dalian Industry University Practice Water Engineering  1996
Jinzhou Water Factory Vehicle  1996-1997
Jinzhou Water Company Pipe Materials  1996-1997
Liaoning Provincial Museum Equipment  1996-1997
Liaoning City Infrastructure Transform Yingkou and Shenyang Water Factory Machinery and Electrical Equipment  1995
China Seven Provincial and City Countryside Supply Water Engineering  1993-1994
Fuxin Daodehai Water Source Engineering  1992-1994
National Educational Committee Equipments  1992-1994
Fushun Plexiglass Factory Control System  1991-1992
OECF Projects (ICB)  
Xian Hei River Diversion Works Equipment  1997
Xian Hei Rriver Big Dan Instruments  1997
Shanxi Jing-xi Natural Gas Pipe Control Instruments  1996
National Information Center Machinery and Electrical Equipments  1995
Next Page

   
  PROJECT INTRODUCTION >>>
   
   
   
Copyright © 1999-2010 Liaoning Instrument Company Ltd. Lic@chinalic.com